Kitchen remodeling services
From a cabinet refresh to a full gut-and-rebuild, every Quad Cities kitchen project starts with a free in-home estimate and a written price. Pick the service closest to your project below.
Most kitchens in Prescott, Prescott Valley, Chino Valley and Dewey-Humboldt fit one of these. Each guide explains the options, timing and what drives cost.
Paint, reface or replace. How to tell whether your boxes are worth saving, and what to check in a cabinet quote.
Kitchen cabinets →Quartz, granite, solid surface, butcher block and laminate compared for hard water, heat and high-altitude sun.
Kitchen countertops →Moving walls, the island, plumbing or gas. Permits, contingency and a realistic 6 to 12 week timeline.
Full remodel cost →What happens from your first call to the final walkthrough, and what a good written estimate includes.
Our process →A refresh keeps the layout and the cabinet boxes. Cabinets are painted or refaced, and the counters, sink, faucet, backsplash and lighting are replaced. It touches everything you see, avoids new plumbing and electrical runs, and usually takes 2 to 4 weeks on site. It is the best value when the kitchen works but looks dated.
A mid-range remodel replaces the cabinets, counters, appliances and flooring in the same footprint. It is the most common project in the Quad Cities' 1990s and 2000s homes, where plumbing and wiring are already in the right places. Plan 4 to 6 weeks on site plus cabinet lead time.
A full remodel changes the room itself: a wall comes down, the island moves, the sink or range relocates, or the kitchen opens to a dining or great room. That brings in framing, plumbing, gas and electrical work, permits, and sometimes an engineer. Plan 6 to 12 weeks, and hold a larger contingency in an older home.
Not sure which you need? The in-home estimate answers that. A licensed local remodeler looks at the kitchen with you and prices the options side by side, so you can see what each step up costs before you decide. Typical ranges for each path are in the kitchen remodel cost guide, and town-by-town notes are on the service areas page.
A mid-range remodel in the existing layout: new cabinets, quartz counters, lighting and appliances. It upgrades the whole room without the cost of moving plumbing or walls.
Yes. Many homeowners start with counters and lighting and replace cabinets later, or the reverse. Ask your remodeler to plan the first phase so it does not have to be torn out in the second.